Enlargement of Cavendish Bridge at Mahebourg.

Client Road Development Authority
Year 2002
Value MUR 20 Million
Position Quantity Surveyor

Description:

  • Breaking up and removal of reinforced concrete payment and kerb.
  • Enlargement of bridge to provide planked walkways on steel structure on both sides including metal balustrading.
  • The work to be carried out approximately 5M above water level.Resurfacing of existing roadworks
  • Landscaping and Associated Works.